Excalibur Estate

Traditional groundworks package carried out on a large new build residential site in Catford. Works consisted of reduce level dig, traditional strip footings, sub structure block work, concrete slabs, site wide drainage and external works. Our works were carried out over 2 visits and the combined duration on site was 46 weeks.

Principal Contractor
Engie
Package Value
£2.2 Million
Sector
Housing
Services Provided
Groundworks, Hard Landscaping, Civil Engineering
Address
Baudwin Rd, London SE6 1RN, United Kingdom